We found 1 class for your selected search criteria
| CON181 | Cost Estimating | 3 Credits | |||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Determining quantities of material, equipment, and labor for a construction project. Includes procedures used to apply unit costs to these items in a minimum of time. Occupational Safety and Health Administration Safety Standards and their impact on construction cost. Prerequisites: None. |
|||||||||||||||||||||||||||||||||||||||||||||||||||
| Class | Location | Delivery | Dates | Days | Times | Instructor | Availability | ||||||||||||||||||||||||||||||||||||||||||||
|
16482
|
Dobson Campus
|
Hybrid In-Person
Lecture
|
08/26/2026 – 12/18/2026
Fall |
-
|
-
|
Closed |
|||||||||||||||||||||||||||||||||||||||||||||
Notes: Hybrid classes include face-to-face format on campus at the time listed in the class schedule. The other part will be held online either without a set time to attend or a Live Online session. Students enrolling in a hybrid class acknowledge they already possess the skills described in the Minimum Computer and Technology Requirements at https://www.mesacc.edu/online/get-started for additional information. |
|||||||||||||||||||||||||||||||||||||||||||||||||||